Commissioning includes the installation of a high-voltage plug, the checking of all machine parameters at the factory, as well as the initial filling and venting of the brewing groups before delivery.
Delivery is coordinated upon agreement.
The installation includes connecting the machine to the socket that has been fully prepared on site, the permanent water connection and the waste water connection, as well as the final check of all functions, the adjustment of the pump and the expansion valve.
According to the terms and conditions, this installation package is a prerequisite for an on-site warranty.