Installation flat fee
Before your machine reaches you, we prepare it carefully: we fit the right three-phase plug, check all factory-set machine parameters and take care of the initial filling and venting of the brew groups, so that it arrives ready to go. We arrange the delivery time with you.
What’s included on site
During installation, we connect your machine to the power socket fully prepared on your premises, as well as to the fixed water supply and the drain. Finally, we check all functions and adjust the pump and expansion valve, so that everything is right from the very first cup.
Under our terms and conditions, this installation package is a prerequisite for warranty service on site.
At a glance
| Service |
Preparation and installation of your machine |
| Before delivery |
Fitting the right three-phase plug, checking all factory-set machine parameters, initial filling and venting of the brew groups |
| Delivery date |
Arranged with you |
| On site |
Connection to the socket fully prepared on your premises and to the fixed water supply and drain, check of all functions, adjustment of pump and expansion valve |
| Warranty |
Under our terms and conditions, a prerequisite for warranty service on site |